Fri 29 Apr 2022 13 28 30 0400 Re Background Information 180765Df 2

Field Value
Category Permits & Municipal > Municipal Correspondence
Confidence medium
Reason [sonnet] Zeeman providing COB/ATT work timeline to engineer
Original File fri_29_apr_2022_13_28_30_-0400_re_background_information_180765df_2.eml
File Type EML
Source gmail-export
fri_29_apr_2022_13_28_30_-0400_re_background_information_180765df_2.eml

Email

Header Value
From Sarah Zeeman <szeeman@gmail.com>
To Vincent Lim <vincent@haight-davis.com>
CC Frank Davis <frank@haight-davis.com>, Lisa Nelson <lisa@haight-davis.com>
Subject Re: Background Information
Date Fri, 29 Apr 2022 13:28:30 -0400
Email Body
COB

   - 6.15.17 COB Began Prepping  area for the stormwater project on my
   corner
   - 6.24.17 Began scraping Osborne rd asphalt and removed my tree and
   corner bush
   - 7.2.17 COB Broke ground
   - 8.17.17 Buried street asphalt in the yard and covered with hay
   - 8.22.18 email attached - Response to my complaints after 430 days of
   the initial concerns/emails etc
   - 10.3.18  Buried topsoil incorrectly
   - https://brookhavenga.citysourced.com/servicerequests/2499482
   - 2.9.22 Email attached COB told me it was my responsibility to fix
   their mishandlings on the corner


ATT

   - 8/8/18 surveyed/ dug up part of drain area and initial steps in
   removing the box
   - 7/17/19 fully removed ATT box
   - (trying to locate the date) They returned after the complaint to dig
   up the remaining underground wires ATT tried to abandon
   - 9/11/19 file date of Record Release
   - ATT Never fulfilled the stipulation section to repair the fence area
   on the original contract.
   - Yes, ATT created the drainage areas prior to removal and after removal
   - I have photos.

I have complete photo/video documentation of everything if needed.

On Fri, Apr 29, 2022 at 10:31 AM Vincent Lim <vincent@haight-davis.com>
wrote:

> Hey Ms. Zeeman,
>
> I am emailing you with regards to getting some more information with
> respect to the background of your property on 2740 Grove STreet NE in
> Brookhaven.
>
> Do you have the specific dates/month of when the City of Brookhaven
> performed their work by the area between the street and your home.
>
> Do you also have the dates of when AT&T performed work by your backyard
> and when the possession of that section was passed between you and AT&T at
> both times. Additionally, was it AT&T that dug the drainage trench
> currently present, and if so when?
>
> Thanks for answering my questions
>
> Regards,
> Vincent Lim, Project Engineer
> Haight Davis & Associates, Inc.
> 1480 Tarver Road
> Davisboro, GA 31018
> Tel:  770-979-6650
> www.haight-davis.com
>
> *PLEASE NOTE CHANGE OF ADDRESS*
>

Attachments

UNADJUSTEDNONRAW_thumb_12c6.jpg (image/jpeg, 327 KB)

UNADJUSTEDNONRAW_thumb_12c6.jpg

Record Release Zeeman (1).pdf (1 MB)

Download PDF

Gmail - Question on Ticket # 2502299.pdf (249 KB)

Download PDF

Emails114_Redacted (2).pdf (840 KB)

Download PDF

Download Original (.eml)