Thu 18 Dec 2025 09 15 56 050 Utf 8 Q Request For Status 2C Findings 2C And Repair Timelin 19B31D14

Field Value
Category Correspondence > Attorney-to-Attorney
Confidence low
Reason Email filename suggests status request, likely attorney communication regarding litigation matters
Original File thu_18_dec_2025_09_15_56_-050_utf-8_q_request_for_status_2c_findings_2c_and_repair_timelin_19b31d14.eml
File Type EML
Source gmail-export
thu_18_dec_2025_09_15_56_-050_utf-8_q_request_for_status_2c_findings_2c_and_repair_timelin_19b31d14.eml

Email

Header Value
From Sarah Zeeman <szeeman@gmail.com>
To Sean McCarthy <sean.mccarthy@brookhavenga.gov>
Subject Request for Status, Findings, and Repair Timeline – Stormwater Pipe & Drain (PW Ticket #4800069)
Date Thu, 18 Dec 2025 09:15:56 -0500
Email Body
Hi Sean,

I hope you’re doing well. Thank you in advance for your attention to the
ongoing stormwater infrastructure issues at the corner of Osborne Road &
Grove Street.

I’m writing to follow up in writing on Public Works Ticket #4800069, as
well as the related stormwater pipe and storm drain issues that have been
identified in the right-of-way adjacent to my property. As of next week,
this ticket will have been open for approximately one year, and the
stormwater pipe and drains have not yet been repaired.

As background, it was communicated to me last year that repairs to the
stormwater pipe and drain were being deferred because an investigation or
evaluation of the stormwater system adjacent to my property, and that this
review needed to occur before corrective work could proceed. Since that
time, I have not received any findings or conclusions from that review, and
the stormwater infrastructure at this location continues to fail.

Given the length of time this issue has remained unresolved — and the fact
that the stormwater pipe and drain at this location have experienced
repeated failures over a number of years, including recurring sinkholes and
right-of-way subsidence — I was hoping you could help clarify the following:

   1.

   What investigation, evaluation, or review was performed regarding the
   stormwater pipe and storm drain at this location;
   2.

   Whether that review has been completed, and if so, what the
   determination was;
   3.

   Why the stormwater pipe and drain repairs have remained deferred for
   nearly a year, despite the ongoing nature of the failures; and
   4.

   What is the current plan and anticipated timeline for repairing the
   stormwater pipe and drain and stabilizing the right-of-way so the issue
   does not continue to worsen.

My goal is simply to understand the status and next steps so the stormwater
infrastructure can be properly addressed before additional damage occurs. I
appreciate how busy Public Works is and am grateful for any clarity you can
provide, or guidance on who is best positioned to move this forward.

Thank you very much for your time and assistance. I look forward to hearing
from you.

Warm regards,
Sarah Zeeman